The Malaysia Renewable Energy Roadmap (MyRER) aims to decarbonise the electricity supply sector, increasing RE installed capacity from 23% (8.5 GW) in 2020 to 31% (12.9 GW) by 2025 and 40% (18 GW) by 2035.
Increasing RE capacity targets aim to cut electricity sector carbon emissions by 45% in 2030 and 60% in 2035. MyRER projects forecast RM20 billion economic spillover by 2025, RM33 billion by 2035, and about 47,000 RE jobs. Current RE sources include solar, biomass, biogas, and hydropower.
652 projects
RM1.0 billion
5 projects
RM1.3 billion
7 projects
RM74.6 million
2 projects
RM62 million
The Government prioritises green adoption by extending the Green Investment Tax Allowance and Green Income Tax Exemption until 2023. Additionally, the Income Tax Exemption (ITE) was prolonged for solar leasing companies to encourage participation in the Net Energy Metering Scheme (NEM) introduced by SEDA.